On this page
Key takeaways
- The post advises building a rough renovation timeline with your contractors before scheduling the move, and expecting that timelines may shift.
- Prioritize the rooms that must work first, usually a bathroom, a functioning kitchen and a safe, clean sleeping area.
- Using storage can reduce clutter, since seasonal decor, extra furniture and some kitchen tools may not be needed right away.
- Label boxes by room and by priority, such as 'unpack immediately' or 'store until later', so a phased move-in is easier.
- Ask your mover whether it can hold items and deliver them in stages, how long storage can last, and what notice it needs for each delivery.
Renovating a home can be one of the most rewarding experiences, but let’s be honest, moving into a house during a renovation can feel like chaos. Dust, noise, construction delays, and a lack of usable rooms all make the process feel overwhelming.
This guide will show you how to move into your home during renovations with as little stress as possible, along with practical tips and solutions we offer to make your experience smoother.
1. Make a Renovation Timeline — Then Expect to Be Flexible
Before scheduling your move, work closely with your contractors to build a rough renovation timeline. Identify:
- Which areas will be completed first
- Which spaces will be livable upon move-in
- Where you'll likely be storing items temporarily
Even with the best plans, renovations rarely go exactly as scheduled. That’s why it’s critical to work with a flexible moving services provider like Bailey’s Moving. We understand timelines can shift.
“We’ve helped many clients who had to adjust move-in dates multiple times. We can store your belongings for as long as you need — no pressure, no rush,” says Austin Ducello, a member of Bailey’s Moving and Storage sales team.
2. Prioritize Which Rooms Need to Be Functional First
When moving into a house during renovation, identify which spaces must be ready before move-in day. Most commonly, you’ll want:
- A working bathroom
- A functioning kitchen (even if temporary)
- A safe and clean sleeping area
Once these areas are usable, you can work around the rest of the house as renovations continue. Bailey’s Moving can help by delivering your belongings in stages — for example, setting up bedrooms first, then common areas later.
“We can hold items in our storage facility and deliver them room-by-room as each area of your home is finished,” Austin explains. “You don’t have to live in clutter while waiting for renovations to be completed.”
3. Use Storage to Reduce Clutter and Chaos
One of the best ways to simplify moving while renovating is to keep some of your items in secure storage. You probably won’t need seasonal décor, extra furniture, or even all your kitchen tools right away. That’s where Bailey’s Moving temporary storage solutions for moving come in.
We offer:
- Short- and long-term storage
- Climate-controlled and secure facilities
- The option to move items into your home gradually
This staged moving process helps keep your space clear and allows your contractors to work without obstacles.
4. Pack Strategically with Renovation in Mind
Label your boxes not just by room but by priority level — for example:
- “Bathroom Essentials – Unpack Immediately”
- “Living Room Decor – Store Until Later”
- “Kitchen – Phase 2”
Clearly organized boxes mean smoother delivery and easier access during each phase of your move-in. You can even keep essential items with you while Bailey’s Moving handles the rest.
5. Communicate with Your Movers Often
Frequent communication ensures everything runs smoothly. Our team will work with you step by step — whether you’re navigating a one-month renovation or a full year of phased construction.
We’ve been doing this for a long time, and our goal is always to minimize your stress.
Why Choose Bailey’s Moving & Storage for Your Renovation Move
With over seven decades of experience in Colorado and Utah, we’ve helped thousands of families transition smoothly — even into homes still under construction. Here’s what sets us apart:
- Flexible timelines to match your renovation schedule
- Secure, on-demand storage with item-by-item release
- Personalized moving plans that adjust as your home comes together
Renovating a home is hard. Moving doesn’t have to be. Get a custom quote today from Bailey’s Moving and Storage, and let’s build a plan that works with your renovation timeline, not against it.
Frequently Asked Questions
How do I plan a move into a house that is still being renovated?
Build a rough timeline with your contractors that shows which areas will be done first, which will be livable at move-in and where items will be stored.
Which rooms should be ready first?
The post says a working bathroom, a functioning kitchen (even a temporary one) and a safe, clean sleeping area.
How can storage help during a renovation?
Storing items you do not need right away keeps your space clear for contractors. Ask your mover how storage is billed and what notice it needs to deliver items out.
Can a mover deliver my belongings in stages?
Ask whether your mover can deliver room by room as areas are finished, and how delivery dates are scheduled. The post says the company can, so confirm it for your move.
How should I label boxes for a phased move-in?
Label by room and priority, such as 'bathroom essentials, unpack immediately' and 'living room decor, store until later'.
Ready to find out what your move should cost? Get Pricing or call 888-260-5717.